LO6: For the first term the team and I will transfer files and documents though Drop box. I have uploaded all the files that the group needs access to start the project off. As the story and production methods are being revised there is no set deadline for tasks as the project is still in a developmental stage. I will be working closely with each of the artists and check their progress on their set task every week to 3 days depending on the task.
LO6: Along with the pitch idea I created a rough production pipeline which can form the basis of the production schedule. The way the chart is layer out show that there will always be multiple aspects of the production being worked on. In this none linear pipeline I hope to fully utilise all the project member's time so that the project can progress with speed.
Below that is a list of all the key roles software specialities and tasks that need to be taken on for this project. This was useful in the pitching process acting almost like an ad board but also keeps me aware of the different disciplines that need to be covered. |